Sma SPEEDWIRE V.1.1 Manual de usuario Pagina 25

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 32
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 24
SMA Solar Technology AG 6 Commissioning
Installation Manual SPW-WebconPB-IA-en-11 25
6.4.2 Registering a Large-Scale PV Plant with Cluster Controller in
Sunny Portal
Requirements:
The large-scale PV plant with Cluster Controller must be commissioned (see Section 6.1).
The inverter with Piggy-Back must be in feed-in operation.
The Cluster Controller must be connected to a router with Internet connection
(see Cluster Controller installation manual).
Your computer must have an Internet connection.
JavaScript must be activated in the Internet browser.
Procedure:
For large-scale PV plants with Cluster Controller, register in Sunny Portal using the
Cluster Controller user interface (see Cluster Controller user manual).
Vista de pagina 24
1 2 ... 20 21 22 23 24 25 26 27 28 29 30 31 32

Comentarios a estos manuales

Sin comentarios